How much concrete or screed do I need?
Enter the area and the thickness. The calculator shows the volume in m³, the weight and how many bags of dry mix you need.
How it is calculated
Volume = length × width × thickness, plus waste for an uneven base. The weight is the volume times the density of the dry mix given by the manufacturer.
Floor screed is usually 4–6 cm thick. A ground-bearing slab or levelling layer 8–12 cm. Above about 1 m³ ready-mix concrete is usually cheaper than bags.
Structural elements (reinforcement, concrete strength class) must always be designed by a structural engineer.
Frequently asked questions
Bags or ready-mix?
For small amounts up to about 0.5–1 m³ bags are practical. For more, ready-mix is cheaper, more consistent and saves a lot of work.
How thick should screed be?
Usually 4–6 cm. Over pipes or underfloor heating allow at least 3–4 cm above them.
How long does screed take to dry?
A rule of thumb before laminate or wood: about 1 week per cm up to 4 cm, 2 weeks per cm up to 6 cm (6 cm ≈ 8 weeks) and 4 weeks for each extra cm. It depends a lot on ventilation and season, so always measure moisture before laying. Tiles can often go down sooner; see the adhesive instructions.